Wet Areas

  • Steel fixing Laundry floor reconstruction
  • Placing plastic membrane for shower area.
  • Preparation for sub-base material
  • Demolition and preparation
  • Completed concrete surface to required falls to take for tiles.
  • Completed plumbing and sub-base preparation
  • Sub base preparation
  • Placement of concrete
  • Curing concrete with plastic membrane
  • Curing concrete
  • Curing concrete with plastic membrace